Steel Embodied Carbon Data for LEED® v5
From the Mill EPD to the Steel on Site
LEED v5 makes embodied carbon a prerequisite. Every Building Design and Construction (BD+C) project must now quantify the cradle-to-gate (A1 to A3) global warming potential of its structure, enclosure, and hardscape, and structural steel is on the minimum list of materials (USGBC credit language). American Katerra documents the embodied carbon of the structural steel we fabricate, from the mill’s Environmental Product Declaration (EPD) to the tonnage in your package. Your LEED consultant gets steel numbers that trace back to source documents, and the same record supports Buy Clean submittals and owner carbon reporting.
What LEED v5 Asks of Your Steel
In LEED v5 BD+C, the embodied carbon data for your structural steel feeds three requirements.
| Requirement | What the project must show | What we provide for the steel |
|---|---|---|
| Quantify and Assess Embodied Carbon (MRp2), required | The A1 to A3 global warming potential of structure, enclosure, and hardscape materials, plus the top three sources of embodied carbon and the reduction strategies considered | GWP per metric ton from mill EPDs, quantities from the model, the package total, and reduction options for the steel |
| Reduce Embodied Carbon (MRc2), up to 6 points (8 for Core and Shell) | A reduction shown through a whole-building life cycle assessment (WBLCA), an EPD analysis against industry averages, or tracking of construction-phase emissions, with results based on materials as constructed. LEED Platinum requires a 20 percent reduction. | Facility-specific Type III EPDs where available, and shipped quantities on request for reconciliation |
| Carbon Assessment (IPp3), required | A 25-year projection of emissions from operations, refrigerants, and embodied carbon, prepared by USGBC from data in the energy, refrigerant, and embodied carbon prerequisites | An early steel estimate on request, so the first projection reflects your frame |
Sources: USGBC credit language for MRp2, MRc2, and IPp3, published on LEEDuser. Interior and enclosure products such as paints, flooring, walls, ceilings, and insulation fall under a separate credit, Building Product Selection and Procurement (MRc4). For structural steel, the embodied carbon requirements are MRp2 and MRc2.
What We Document for Your Steel Package
For each package, our life cycle assessment team can prepare:
- Global warming potential per metric ton for each steel product, modules A1 to A3, in kg CO2e, based on the mill’s facility-specific Type III EPD where available
- Quantities in metric tons by product type, taken from the same Tekla model we use for shop drawings
- The package total in kg CO2e, for all or part of the steel scope
- Copies of the EPDs on request, with program operator, registration number, and validity dates
- Mill test reports tied to heat numbers, which keep each member’s mill of origin on record so the right EPD can be matched
- Final shipped quantities on request, to support the as-constructed calculation
We can provide the data in the units and format your LEED consultant or LCA software uses, and align it with a whole-building LCA when your team runs one. Because the numbers come from the same model that drives fabrication, they reflect the steel you actually receive. That is the idea behind our Green Information Modeling™ approach.
When to Bring Us In
1. Design
Bring us in while the design is still open. Working from your drawings, we can help estimate the embodied carbon of the steel and identify reduction options your team can cite in the MRp2 hot-spot narrative. An early steel estimate also gives the USGBC carbon projection a better starting point.
2. Procurement
We collect each mill’s facility-specific EPD at procurement. On request, we compare the figures with any GWP limit in your specification. Sharing that limit early leaves more room to choose sources.
3. Delivery and Closeout
Mill test reports tied to heat numbers keep a record of where each member’s steel was made. At closeout, we can provide shipped quantities and final figures for the as-constructed reconciliation that the Reduce Embodied Carbon credit requires.
How to Lower the Steel Number
About 90 percent of the A1 to A3 footprint of fabricated hot-rolled sections comes from making the steel (AISC). U.S. hot-rolled sections are made in electric arc furnaces, where most emissions trace back to the power grid, so the mill you source from matters most (AISC).
Tonnage comes next, and the engineer of record controls it. Waste comes third, and ordering from model quantities helps keep it low. Our Green Steel lets you specify lower-carbon structural steel for all or part of a package and report the difference against the industry average. For the full approach, see Green Structural Steel™.
Steel Embodied Carbon and LEED v5 FAQs
Does LEED v5 require embodied carbon data for structural steel?
Yes, for Building Design and Construction projects. The Quantify and Assess Embodied Carbon prerequisite (MRp2) requires the A1 to A3 global warming potential of the structure, enclosure, and hardscape, and structural steel is on the minimum list of materials. The team must also name the top three sources of embodied carbon and describe the strategies considered to reduce them.
Can structural steel earn LEED v5 points?
LEED points are awarded to projects, and USGBC does not certify or endorse products, so no product earns a point on its own. Steel documented with product-specific or facility-specific Type III EPDs can contribute to the Reduce Embodied Carbon credit (MRc2), worth up to 6 points for New Construction and 8 for Core and Shell. Projects aiming for LEED v5 Platinum must also show a 20 percent reduction in embodied carbon.
What kind of EPD does a LEED v5 project need for steel?
The prerequisite needs a global warming potential value per unit for each material. The EPD analysis in the Reduce Embodied Carbon credit uses product-specific or facility-specific Type III EPDs and compares them with industry averages. For reference, AISC’s industry-average EPDs put fabricated hot-rolled sections at 1,080 kg CO2e per metric ton for A1 to A3 (AISC). We work from the facility-specific EPDs of the mills that produced your steel where they are available.
Is embodied carbon the same as operational carbon?
No. Operational carbon comes from running a building over its life. Embodied carbon is locked in before occupancy, in materials like steel and concrete. LEED v5 brings both into one 25-year projection under the Carbon Assessment prerequisite (IPp3).
Where does steel’s embodied carbon come from?
Mostly from steelmaking. According to AISC, producing the steel accounts for about 90 percent of the A1 to A3 footprint of fabricated hot-rolled sections. Transport to the fabricator and fabrication make up the rest, which is why sourcing matters most.
Can you provide data for only part of a project?
Yes. We can document the steel scope we fabricate, for all or part of a package, and hand it to your LEED consultant or LCA team in a format they can use.
Does this help projects registered under LEED v4.1?
Yes. USGBC extended LEED v4 and v4.1 commercial registration to June 30, 2027, and registered projects can certify until June 30, 2033 (UL Solutions). The same EPDs and quantities support the life cycle assessment and EPD credits in LEED v4.1.
Contact Us
Working toward a LEED v5 submission, a Buy Clean requirement, or an owner carbon target? Send us your drawings and specification early. We will confirm what your LEED consultant needs for the steel, show you the package in kg CO2e per metric ton, and point out where sourcing and fabrication can lower it. Bilingual project coordination is available. Talk to a project engineer or request a capability statement.